Split with rail

Summary column + vertical rail archetype shell.

Default

Project

my-dashboard

A summary column is ideal for identity, stats, or a profile snapshot. The right column holds a timeline, log, or event rail.

Environment

Production

Region

us-east-1

Recent activity

  1. Deployment triggered
  2. Build completed
  3. Tests passed
  4. Config updated
Custom Layout

Onboarding

Get started

Complete each step to unlock the full product experience. You can come back to any step at any time from your settings page.

Progress3 / 5 complete

Setup checklist

  1. Account created

    Signed up via Google OAuth.

    Step 1 of 5
  2. Profile completed

    Name, timezone, and avatar set.

    Step 2 of 5
  3. Team invited

    Sent 3 invitations — 2 accepted.

    Step 3 of 5
  4. Integration connected

    GitHub repository linked.

    Step 4 of 5
  5. First project created

    Waiting for you to add a project.

    Step 5 of 5
Metrics Summary

Service health

api.example.com

94
Uptime
Requests / min
4.2k+12%
Avg latency
38ms-4ms
Active users
291+8
Error rate
0.3%+0.1%
All systems operational
Last hour
  1. P99 latency within SLA3m ago
  2. Auto-scaled to 6 replicas18m ago
  3. Memory usage above 80%34m ago
  4. Memory pressure resolved41m ago
Earlier today
  1. Database connection spike2h ago
  2. Connection pool restored2h ago
  3. Scheduled cert renewal4h ago
  4. Config deploy (v2.13.9)6h ago
Monitoring started
With Event Timeline

Deployment

v2.14.0

Triggered by push to main

LiveHealthy
Triggered bycarol@example.com
Branchmain
Commita3f9c12
Duration2m 7s
EnvironmentProduction

Pipeline events

  1. Deployment succeeded

    All 38 checks passed. Serving traffic.

    2026-05-31T14:22:01Z
  2. Smoke tests running

    Verifying /healthz and critical endpoints.

    2026-05-31T14:21:45Z
  3. Build completed

    Compiled 312 modules in 14.2 s.

    2026-05-31T14:20:58Z
  4. Cache miss on node_modules

    Cold install took 42 s — consider pinning a lock file.

    2026-05-31T14:20:12Z
  5. Pipeline triggered

    Push to main by carol@example.com.

    2026-05-31T14:19:55Z
With Timeline Rail
A

alice@example.com

Member since Jan 2025

Active sessionPro

12

Sessions

47m

Total time

Details

CountryUnited States
BrowserChrome 124
First seen3 days ago
Today
  1. Visited /pricing2m ago
  2. Clicked 'Start trial'3m ago
  3. Visited /features5m ago
  4. Visited /home8m ago
Yesterday
  1. OAuth sign-in via GitHub1d ago
  2. Visited /docs/quickstart1d ago
  3. Visited /home1d ago
This is where their journey begins

Installation

npx shadcn@latest add @byronwade/split-with-rail